At $3,728 gold, ALTN at 718p is on 4.3x current earnings (EPS 168.1p).
Opens with prices from 19 Nov 2026. Type today's figures in to update.
Above ~8x is generous for a single mine in Kazakhstan with a finite life and a licence that expires in July 2029 — treat these values as optimistic.
The company estimates $125m to take Sekisovskoye to 2–2.5Mtpa (roughly 53 → 100koz/yr), about $2.65m per extra koz of annual output; the model scales capex with the expanded output you choose. The Teren-Sai production licence (expected by end-2026) and the Sekisovskoye licence renewal (expires July 2029) are still outstanding, so set the delay and chance of delivery to your own view. Scale-up cost settings are model assumptions.
Calibrated to H1 2026 results. The fixed/variable split of site costs is a model assumption (≈ $1,225/oz in total). Kazakh mineral extraction tax runs from 7.5% at gold ≤ $2,800 to 11% at ≥ $3,800; the bands in between are approximated as a straight line.